五五字典>英语词典>backlog翻译和用法

backlog

英 [ˈbæklɒɡ]

美 [ˈbæklɔːɡ]

n.  积压的工作
vt.  (使)积压; 储存

复数:backlogs 过去分词:backlogged 现在分词:backlogging 过去式:backlogged 第三人称单数:backlogs 

BEC计算机

Collins.1 / BNC.14585 / COCA.14476

牛津词典

    noun

    • 积压的工作
      a quantity of work that should have been done already, but has not yet been done

      柯林斯词典

      • N-COUNT 积压的事情;未完成的工作
        Abacklogis a number of things which have not yet been done but which need to be done.
        1. There is a backlog of repairs and maintenance in schools.
          对各学校的修缮和维护工作积压了一堆。

      英英释义

      noun

      • an accumulation of jobs not done or materials not processed that are yet to be dealt with (especially unfilled customer orders for products or services)
        1. something kept back or saved for future use or a special purpose
            Synonym:reservestockpile
          1. the large log at the back of a hearth fire

            verb

            • accumulate and create a backlog

              双语例句

              • This list of tasks becomes the Sprint Backlog.
                任务的列表就成了所谓的代办冲刺。
              • Some teams estimate the size of all of the items in their backlog prior to any development.
                有些团队在任何开发之前都要对他们积压中所有条目的大小进行评估。
              • Or there's a major backlog at an important filing cabinet.
                或在重要文件柜中有一件重要的却被积压的工作;
              • Whenever a requirement is entered into the backlog, ensure that the related customer need is properly understood.
                只要向待办事项列表中添加了新的需求,我们就需要确保正确地理解了相关的客户需求。
              • This view can be kept open along with the Sprint Backlog view.
                这个视图可以随着SprintBacklog视图一直打开着。
              • The product backlog items are estimated.
                产品待办事项列表中的待办项都是被估算过的。
              • Such changes and any missing or incorrect functionality were added to the product backlog for the next sprint.
                这些修改和任何缺失的或错误的功能都添加到下一次sprint的产品待办事项中。
              • The project backlog is the specific set of work that is required for the project.
                项目backlog是项目需要做的具体的工作集合。
              • This backlog has been worked through the system and suppliers in this sector are anticipating a difficult time ahead.
                这些积压的订单已经完成,这个行业的系统和供应商预计未来将是一段艰难的日子。
              • First, create a Sprint Backlog iteration plan.
                首先,创建一个SprintBacklog迭代方案。